骑分解(Rides break down)——欧美迪斯尼乐园十大最糟糕的事情

骑分解(Rides break down)——欧美迪斯尼乐园十大最糟糕的事情 在 《欧美迪斯尼乐园十大最糟糕的事情》 中排名第9名。 我的妹妹,我和表兄弟,排队等候2小时散热器弹簧和它决定打破。我们很疯狂,我们离开,我们回去后又工作了,我们骑着它。什么比开幕,客人必须等6个小时骑它!和线从门口延伸到pier.Yet分解那天也导致那样。-格...

骑分解欧美迪斯尼乐园十大最糟糕的事情在欧美迪斯尼乐园十大最糟糕的事情中排名第9名。


我的妹妹,我和表兄弟,排队等候2小时散热器弹簧和它决定打破。我们很疯狂,我们离开,我们回去后又工作了,我们骑着它。 什么比开幕,客人必须等6个小时骑它!和线从门口延伸到pier.Yet分解那天也导致那样。-格雷戈里 这不会发生。但它当它。- nintendofan126糟透了

·······································································


·······································································

我们精选了部分网友观点:

···································································


我的妹妹,我和表兄弟,排队等候2小时散热器弹簧和它决定打破。我们很疯狂,我们离开,我们回去后又工作了,我们骑着它。


My sister, cousins, and I waited in line for 2 hours for Radiator Springs and it decided to break down. We were so mad that we left. We went back later and it was working again and we rode it.

···································································


什么比开幕,客人必须等6个小时骑它!和线从门口延伸到pier.Yet分解那天也导致那样。-格雷戈里


That's nothing compared to the opening day, where guests had to wait 6 HOURS to ride it!And the line stretched from the entrance to the pier.Yet it did break down that day too leading to that. - Gregory

···································································


这不会发生。但它当它。- nintendofan126糟透了


This doesn't happen that much. But it sucks when it does. - nintendofan126


Once I was stuck on California screaming. - AnonymousChick

  • 发表于 2020-11-30 22:53
  • 阅读 ( 538 )
  • 分类:公司

你可能感兴趣的文章

相关问题

0 条评论

请先 登录 后评论
admin
admin

0 篇文章

作家榜 »

  1. xiaonan123 189 文章
  2. 汤依妹儿 97 文章
  3. luogf229 46 文章
  4. jy02406749 45 文章
  5. 小凡 34 文章
  6. Daisy萌 32 文章
  7. 我的QQ3117863681 24 文章
  8. 华志健 23 文章

推荐文章

联系我们:uytrv@hotmail.com 问答工具